The long awaited framing for the atrium glass has begun! Erie Glass should have the atrium enclosed by the end of the week, then the rest of the trades can finish up - electricians, plumbers, drywallers, painters, etc.
After the epoxy floor is in, the kitchenette can be installed, stairs and chair lift to the deck set in place, and painting completed. In the first week of May, we hope to have the four cement patios poured, front and back of the atrium, and outside each of the two main floor bedrooms. Shopping for beds, linens, furnishings, etc. has started, and Sipkens Nurseries, Sarnia, should begin work on their landscaping design (with mostly native plants) by end of May. Still lots to do, but the atrium glass is key to this last push to the finish.